Out for Comment: IGEM/GM/8 Edition 3 - Meter installations of flow exceeding 6 cubic meters per hour Part 1 - Design
This draft Standard has been prepared by a Panel under the chair, David Harper, and are presented to Industry for comments which are required by 29 November 2024, and in accordance with the attached comment form.
This is a draft document and should not be regarded or used as a fully approved and published Standard. It is anticipated that amendments will be made prior to publication.
It should be noted that this draft Standard contains intellectual property belonging to IGEM. Unauthorised copying or use by any unauthorised person or party is not permitted.
This is a copyright document of the Institution of Gas Engineers and Managers and all enquiries should be addressed in the first instance to:
Peter Hurst
Tel: 01509 678150
Email: [email protected]
The review of Part 1 has resulted in changes to the requirement, but not limited to the following:
- Legislation
- British and European Standards
- Thermal mass meters
- Noise and Vibration
- Heating
- Filtration (was Gas cleaning)
- Pressfit
- Jointing
- Welding Standards aligned with IGEM/UP/2
- Protection against corrosion (cathodic) aligned with IGEM/TD/13
- Greenhouse emission trading scheme.
Deadline: 31 January 2025
Draft: IGEM/GM/8 Edition 3 - Meter installations of flow exceeding 6 m3 per hour Part 1 DesignComment Form