Supporting the gas industry since 1863
Sign In

IGEM/GM/8 Part 4 - Operation and maintenance

These procedures apply to all new onshore gas supply meter installations carrying Natural Gas of flow rate >6 m3h-1 and maximum operating pressure ≤38 bar. It deals with the operation and maintenance of relevant installations. It details:

  • Legal considerations such as Gas Safety (Installation and Use) Regulations and Electricity at Work Regulations.
  • General principles such as work systems, emergency arrangements and maintenance philosophies.
  • Operational checks and tests.
  • Record keeping.

 

Follow Us on:

Follow us on FacebookFollow us on TwitterFollow us on LinkedInFind us on YouTubeFind us on Flickr